STAHL 5/3.2 t Double Girder Crane for Mold Turning on a Free-Standing Structure, Pathum Thani

In the DC3 area of an aluminium auto parts plant in Nava Nakorn, ALLA installed a STAHL 5/3.2 t double girder crane with two hoists for turning molds, on a free-standing structure.

Project Specifications

BrandSTAHL
Crane typeDouble girder overhead crane with 2 hoists
Capacity5/3.2 t
UseTurning and holding molds
StructureFree-standing columns, runway beams and rails
CertificationLoad test and Por.Jor.1 (ปจ.1) engineer certificate as required by Thai law
LocationDC3 area
Project periodSep – Nov 2023

Project Highlights

  • Two hoists of different sizes on one crane to turn molds safely
  • Free-standing columns, runway beams and rails supplied and installed
  • Basic operator training for correct, safe use

What did the customer need?

A maker of formed aluminium parts for motorcycle and car manufacturers needed an overhead crane for its production line in the DC3 area:

  • Hoists able to turn and hold molds, with two hoist sizes on the same crane
  • Design and supply of the crane, with installation of a free-standing structure: columns, runway beams and rails
  • Load test and Por.Jor.1 (ปจ.1) certificate

How did ALLA deliver it?

ALLA designed and calculated the crane to the customer’s needs, delivered it safely and on schedule, and gave basic operator training so the crane is used correctly and safely.